
Moonstone
Moonstone is a G+2 Podiums+16 Floors branded residential tower with 200 residential units and 4 commercial spaces. The project has been designed to have a clear sea view for all residential units. The project is located in Al Marjan Island, a man-made island which has successfully transitioned into a world-class hospitality destination.
The Design Concept
The design concept of the development was inspired by the coral, which is the meaning behind the name ‘Al Marjan’. The building's M-shape was derived from the Moonstone, a beautiful type of coral, and was created to maximize the sea view from each apartment and room.
The building's layout is designed around a single loaded corridor, which allows for an unobstructed view of the sea. Each apartment features a spacious, 2.4-meter-wide continuous balcony, providing ample outdoor living space. The balcony's movable sun screens provide residents with flexible shading options, while the full vision glass panels offer an uninterrupted view of the Arabian Gulf water.
The building's design elements prioritize the natural beauty of the surrounding environment, creating a sense of harmony between the built and natural environment. The overall design provides residents with a comfortable and enjoyable living experience, while also offering a luxurious resort-like atmosphere.


Project Physical Description
The project comprises of 200 Residential units including One, Two, Three, Four Bedrooms apartments and luxury villas and 4 Commercial units at the ground floor.
The residential apartments comprising of 62 One Bedrooms with an average area of 865 sq.ft, 98 Two Bedrooms with an average area of 1,500 sq.ft, 30 Three Bedrooms with an average area of 2,360 sq.ft, 4 Four bedrooms with an average area of 6,290 sq.ft. and 6 unique villas with average area of 8,300 sq.ft.
The 2 Commercial units are 710 sq.ft. each and other 2 are 283 sq.ft. each.
The project has high quality amenities matching with unique design of the building; which includes, Swimming Pool, Gym, Steam, Sauna, Spa and Playgrounds etc.
The project will begin construction in Q3 2023 and will be handed over by Q2 2026.
Projects